For remote facilities, the availability of existing power source tie-ins and waste heat inefficiencies of on-site generation are ongoing challenges of conventional power solutions.
The TDE team can help turn waste heat into process heat and deliver an electricity and heat cogeneration plan that provides reliable energy with less carbon emissions than independent generation of heat and power.
ELECTRIC POWER
Electrification of Equipment
With the environmental and financial imperatives of reducing carbon emissions, developing new energy strategies for brown and greenfield facilities is key.
Replacing fossil fuel driven power generation equipment with higher efficiency alternatives, introducing a high efficiency power island, or utilizing low-carbon intensity grid power are readily available solutions for creating an environmentally responsible power strategy.
Electrification with Green Grid Power
TDE has the expertise and resources to evaluate power and process heating systems and deliver the required modifications enabling utilization of a green power source achieving reduced emissions.
Eliminating concerns of existing grid stability and carbon intensity by utilizing alternate process heating technologies can effectively reduce overall cost of ownership of a facility.
For remote facilities, the availability of existing power source tie-ins and waste heat inefficiencies of on-site generation are ongoing challenges of conventional power solutions.
The TDE team can help turn waste heat into process heat and deliver an electricity and heat cogeneration plan that provides reliable energy with less carbon emissions than independent generation of heat and power.
-Tim Fernandez/ Laurie Trent (power gen)
have a project you'd like to discuss?
get in touch.
CORPORATE HQ
1424 70th Ave.
Edmonton, Alberta
Canada T6P 1P5
Telephone 780.440.6064
Fax:780.440.1657
Mailing address
Thermo Design Engineering
Box 5557 SECSC
Edmonton, Alberta
Canada
T6E 6P8